When you place your first order with an overseas factory, the price on the quotation is only half the deal. The other half is when the money moves — and getting payment terms with an electric wheelchair factory right protects both sides: the factory can buy materials and book production with confidence, and you keep leverage until the goods are verified and shipped. This guide explains the four structures you will actually meet — 30/70 T/T, payment against a bill of lading copy, letter of credit, and escrow — when each one fits, the red flags that should stop a payment, and how to tie the balance to inspection so the terms work in practice, not just on paper.
Buyer and factory representative reviewing payment documents in a factory office

What Does a Standard 30/70 T/T Structure Actually Mean?

T/T stands for telegraphic transfer — a bank-to-bank wire. Under a 30/70 split, you pay 30% of the order value as a deposit when the order is confirmed, and the remaining 70% before the goods ship. The deposit lets the factory commit materials and a production slot; the balance settles the order before the container leaves. This is the most common structure for a first order, and there is a practical reason for that. A wheelchair factory builds to order: frames, motors, controllers, and batteries are bought or allocated for your specific configuration. Without a deposit, the factory carries the full cost of a custom build that may not have another buyer. The deposit is what turns a quotation into a production plan. One point buyers sometimes miss: the deposit percentage is not the whole story. What matters just as much is what triggers the balance. “Balance before shipment” can mean the day the goods are finished, the day they are loaded, or the day the shipping documents are ready. Get the trigger in writing — it is the difference between paying for goods you have verified and paying for goods you have only heard are ready.

When Does Payment Against a B/L Copy Make Sense?

A bill of lading (B/L) is the carrier’s receipt for the goods. Under payment against B/L copy, you pay the balance when the factory sends you a copy of the bill of lading — proof that the goods are actually on a vessel and on their way — rather than before loading. This structure fits repeat orders, where the relationship already has a track record. The factory has shipped to you before, you know the quality, and the B/L copy gives you shipment proof before the final payment. It is a middle ground: the factory still gets paid before the goods arrive at your port, and you do not pay the balance for goods that have not shipped. For a first order, most factories will not offer this. They have no history with you, and the B/L copy structure shifts more risk to their side. If a factory offers it on a first order without being asked, that is not automatically a problem — but it is worth understanding why, and it does not remove the need for the other checks in this guide.

When Should You Use a Letter of Credit?

A letter of credit (LC) is a bank’s promise: your bank guarantees payment to the factory, provided the factory presents the documents the credit lists — typically the commercial invoice, packing list, bill of lading, and any certificates you specified. If the documents comply, the bank pays. If they do not, the bank can hold payment until the documents are corrected. An LC fits three situations. First, larger first orders, where neither side wants to carry the full trust burden alone. Second, buyers whose company or finance rules require bank-backed payment. Third, markets or relationships where a bank guarantee is simply the expected way to trade. The trade-offs are real. An LC involves bank paperwork on both sides, and documentary precision matters: a mismatch between the credit and the documents — a wrong port name, a missing certificate — can delay payment while the papers are corrected. The bank’s charges also have to be assigned: who pays them is negotiable and should be stated in the contract, not discovered on the first statement. For smaller orders, the paperwork and cost can be disproportionate, which is why many buyers reserve LCs for larger commitments and use T/T for routine orders.

Where Does Escrow Fit?

Escrow uses a neutral third party to hold the payment. You deposit the funds with the escrow provider, and the provider releases them to the factory only when the agreed conditions are met — for example, inspection passed, or shipping documents delivered. If the conditions are not met, the funds are returned under the escrow terms. Escrow fits first orders placed through a trading platform, and smaller orders where an LC would be disproportionate but you still want a neutral holder between you and an unknown supplier. The key question to ask before using escrow is what the release conditions actually are, and how disputes are resolved. An escrow arrangement is only as strong as its release rules: “release on shipment” and “release on inspection passed” are very different protections, so read the conditions before you fund it, not after.
Shipping documents including invoice, packing list, and bill of lading on a desk

How Do You Match the Structure to Order Value and Trust Level?

There is no single “best” structure — only the structure that fits the order in front of you. The two variables that matter most are how much is at stake and how much history you have with the factory. The table below is a starting framework, not a rule; adjust it to your situation.
SituationStructure that usually fitsWhy it fits
First order, small trial (e.g., a sample or a few units)30/70 T/TLow exposure, simple paperwork, and the factory can start production on the deposit.
First order, full container30/70 T/T, or LC if your finance rules require itThe deposit commits production; an LC adds bank backing where the amount justifies it.
Repeat order, established trustBalance against B/L copyYou have a track record, and the B/L copy proves shipment before the balance moves.
Larger program or custom developmentMilestone payments tied to agreed stagesPayments follow progress — deposit, inspection sign-off, then balance — rather than a single leap.
If you are still deciding how many units to start with, our guide to what the MOQ means for custom electric wheelchairs explains how order size interacts with pricing and production. And because payment timing and production timing move together, it is worth reading our explanation of electric wheelchair lead times alongside this guide, so the balance trigger lands on a date you can actually plan around.

What Deposit Red Flags Should Stop You?

Most payment problems are preventable, and they usually announce themselves early. Treat any of these as a full stop, not a detail to sort out later. First, the bank account name must match the company name on your contract and invoice. If the beneficiary name is different — a trading company you have never heard of, or any name that does not match the factory you are dealing with — stop and ask why before you send anything. Second, never pay into a personal account. A legitimate factory is paid through a company account. A request to wire money to an individual’s name is one of the clearest warning signs in export trade, whatever the explanation offered. Third, treat changed bank details as an emergency, not an administrative update. If new account details arrive mid-deal — especially by email — do not use them until you have verified them through a channel you already trust: a phone call to a number you already have, or a contact you have already dealt with. Fraudulent “updated bank details” messages are a known pattern, and the verification step costs minutes against a loss that cannot be undone. Fourth, resist pressure to pay outside the agreed channel. If the agreed structure is T/T to the company account and someone asks you to use a different method, a different account, or an intermediary, that change itself is the red flag — regardless of how urgent the reason sounds. Payment checks are part of evaluating a supplier, not separate from it. Our guide to evaluating an electric wheelchair factory covers the broader checks — production capability, documentation, and communication — that sit alongside these payment rules.
Workers assembling electric wheelchairs on a factory production floor

How Do You Link the Balance to Inspection?

The strongest protection in any payment structure is not the structure itself — it is the link between the balance and inspection. A balance that is due “before shipment” with no inspection condition is just a date. A balance that is due “after inspection sign-off” is a quality gate. Agree the inspection arrangement in writing before production starts, not when the goods are finished. The agreement should cover three things: who inspects (your own visit, a third-party inspection company, or the factory’s documented checks with photos and video), what “passed” means (which checklist, which tolerances, and how defects are classified), and what happens if the goods fail (rework and re-inspection, and how the shipment date moves). Sample inspection and bulk inspection are different jobs. The sample phase — testing one or two units the way your customers will use them — is covered in our guide to evaluating electric wheelchair samples. The balance inspection is the bulk-order equivalent: it confirms that the production run matches what the sample promised. Both matter, and neither replaces the other. If you use a third-party inspector, agree who pays for the inspection and what happens to the balance if the report is not clean. If the factory provides photos and video instead, agree what must be shown — the finished chairs, the folding mechanism, the labels, the packed cartons — so “photos provided” means evidence, not a gallery.

What Is Negotiable, and What Usually Is Not?

Buyers sometimes treat payment terms as take-it-or-leave-it. In practice, parts of the structure are negotiable and parts are not, and knowing which is which saves both sides a wasted negotiation. Usually negotiable: which structure you use on repeat orders; whether the balance is due before shipment or against the B/L copy; the inspection arrangement tied to the balance; who bears the bank charges; and the currency of payment. For larger programs, milestone payments tied to production stages are also on the table. Usually not negotiable on a first order: the deposit itself, and payment before the goods leave the factory. A factory that builds to order cannot start production without a deposit, and it cannot ship unpaid goods to a buyer it has never traded with. Asking for open-account terms — pay after delivery — on a first order is unlikely to succeed, and pushing it hard can signal that you do not understand how export production works. What is negotiable grows with history. After a few clean orders, the conversation changes: B/L-copy terms, longer inspection windows, and milestone structures for bigger programs all become easier to agree, because the trust has evidence behind it.

What Should the Payment Clause in Your Contract Actually Say?

Payment terms agreed by email and chat are easy to misremember. Put them in the contract or the order confirmation, and make the clause cover the specifics: – The amounts and the split — deposit percentage and balance percentage, in the agreed currency. – The trigger for each payment — what event releases the deposit, and what event releases the balance. – The bank details — beneficiary name, account number, and bank, verified to match the company name. – The inspection link — who inspects, what “passed” means, and what happens if it fails. – Bank charges — who bears the sending and receiving charges. – Delay — what happens if either side misses a date, on payment or on shipment. Putting payment terms in writing starts earlier than the contract. Our RFQ template for electric wheelchairs includes payment terms as a standard section, so the structure is agreed before the quotation, not negotiated after it. And for custom or OEM programs, our guide to how long electric wheelchair OEM takes shows how payment milestones line up with development and production stages.
Business handshake over a signed supply contract at a wheelchair factory

What Mistakes Do First-Time Buyers Make?

The same mistakes appear again and again, and all of them are avoidable. Paying 100% upfront on a first order. It removes every lever you have — inspection, timing, and correction — before the goods exist. A deposit-plus-balance structure exists precisely so you do not have to do this. Accepting changed bank details without verification. Covered above, but it bears repeating because it is the costliest single mistake: one unverified wire can exceed the value of every other term in the deal. Leaving inspection out of the payment clause. A balance due “before shipment” with no inspection condition means you pay on the factory’s word that the goods are ready. Tie the balance to a defined inspection, and the clause does the work for you. Assuming domestic payment habits transfer. Open-account terms, payment after delivery, and long credit periods are normal in some domestic markets. In export manufacturing, they are the exception, not the rule, and they are earned through a trading history — not requested on a first order.
Workers assembling electric wheelchairs on a factory production floor

Conclusion

A good payment structure is not about squeezing the factory or protecting yourself at the other side’s expense — it is about matching the money to the trust that actually exists. Small first orders run on a deposit and a balance. Larger first orders may justify bank backing. Repeat orders earn more flexible triggers. And at every stage, the balance should be tied to something verifiable, not just a date on a calendar. Getting payment terms with an electric wheelchair factory right at the start is what lets the rest of the relationship — samples, production, inspection, and repeat orders — run on evidence instead of hope.
Electric wheelchairs on display in the factory showroom

FAQ

Can I pay the full amount after the goods arrive at my port?

On a first order, almost certainly not. Export factories build to order and ship against payment, not against a promise. Open-account terms are earned through a trading history — after several clean orders, the conversation is different, but it is not a starting position.

Is 30/70 the only deposit split factories accept?

No. 30/70 is the most common, but the split itself is negotiable — what matters more is the deposit amount relative to the factory’s material commitment, and the trigger for the balance. Agree both in writing rather than treating the percentage as the whole deal.

What should I do if the factory sends new bank details during the order?

Stop. Do not use the new details until you have verified them through a channel you already trust — a phone call to a number you already have, or a contact you have already dealt with. Do not verify them by replying to the message that announced the change.

Do I need a letter of credit for a first order?

Not necessarily. For a small first order, 30/70 T/T is simpler and usually sufficient. An LC makes sense when the order is large, when your finance rules require bank backing, or when neither side has a track record and the amount justifies the paperwork.

Who pays the bank charges on a transfer?

Whoever the contract says pays them. Sending and receiving charges can fall on either side, and the split should be stated in the payment clause before the first transfer — not discovered on the first bank statement.

Can the balance be tied to a third-party inspection?

Yes, and it is one of the strongest protections available. Agree it in writing before production: who inspects, what “passed” means, and what happens to the balance and the shipment date if the report is not clean. Key Takeaway: Match the payment structure to the trust level, never pay into an account that does not match the company name, and put the balance trigger and the inspection rule in writing before production starts.